Triple Stainless Steel Tube Water Feature designed and built specifically for Lincoln Co-Op Funeral Services new £2million Headquarters building on Tritton Road, Lincoln which is opening in January 2015
The purpose-built Tritton centre consists of a meeting room and a chapel of rest, meaning funeral ceremonies can be held on the site, so the client was keen to provide a relaxing and striking water feature within the reception area - a tubed water feature lent itself well, and was designed built into a central raised seating area
The water feature comprises 3 bright polished stainless steel tubes of 172mm diameter, ranging in height from 2150 / 2000 and 1850 mm. It provides a restful and relaxing focal point to a bright and airy reception area
The installation was completed on 23rd December 2014 - David Dernley, Head of Funeral Service wrote:
" Hi Jeff
All finished and looking great.
Many thanks - pleased as punch with it!
Have a great Christmas
David "


.jpg)

|